Skip to content

Commit fcb9f91

Browse files
authored
Update docs/relational-databases/maintenance-plans/maintenance-plan-design-tab.md
1 parent 6b97891 commit fcb9f91

1 file changed

Lines changed: 1 addition & 1 deletion

File tree

docs/relational-databases/maintenance-plans/maintenance-plan-design-tab.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -98,7 +98,7 @@ To specify task parallelism, link two or more dependent tasks to a single preced
9898

9999
### Edit task properties
100100

101-
After a maintenance task is placed on the design surface, its properties can be edited as needed. For example, the specific database to back up in a Back Up Database task is specified after the task is added the plan. Tasks on the design surface that aren't properly configured contain a red icon with a white x.
101+
After a maintenance task is placed on the design surface, its properties can be edited as needed. For example, the specific database to back up in a Back Up Database task is specified after the task is added to the plan. Tasks on the design surface that aren't properly configured contain a red icon with a white x.
102102

103103
## Extra features available from the shortcut menu
104104

0 commit comments

Comments
 (0)