You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Represents a Planner task in Microsoft 365. A Planner task is contained in a plan and can be assigned to a bucket in a plan. Each task object has a details object that can contain more information about the task. For more information about relationships between group, plan, and task, See Use the Planner REST API.
Bucket ID to which the task belongs. The bucket needs to be in the plan that the task is in. It's 28 characters long and case-sensitive. Format validation is done on the service.
checklistItemCount
Int32
Number of checklist items that are present on the task.
Read-only. Date and time at which the 'percentComplete' of the task is set to '100'. The Timestamp type represents date and time information using ISO 8601 format and is always in UTC time. For example, midnight UTC on Jan 1, 2014 is 2014-01-01T00:00:00Z
conversationThreadId
String
Thread ID of the conversation on the task. This is the ID of the conversation thread object created in the group.
Read-only. Date and time at which the task is created. The Timestamp type represents date and time information using ISO 8601 format and is always in UTC time. For example, midnight UTC on Jan 1, 2014 is 2014-01-01T00:00:00Z
dueDateTime
DateTimeOffset
Date and time at which the task is due. The Timestamp type represents date and time information using ISO 8601 format and is always in UTC time. For example, midnight UTC on Jan 1, 2014 is 2014-01-01T00:00:00Z
hasDescription
Boolean
Read-only. Value is true if the details object of the task has a nonempty description and false otherwise.
id
String
Read-only. ID of the task. It's 28 characters long and case-sensitive. Format validation is done on the service.
orderHint
String
Hint used to order items of this type in a list view. The format is defined as outlined here.
percentComplete
Int32
Percentage of task completion. When set to 100, the task is considered completed.
planId
String
Plan ID to which the task belongs.
previewType
String
This sets the type of preview that shows up on the task. The possible values are: automatic, noPreview, checklist, description, reference.
priority
Int32
Priority of the task. The valid range of values is between 0 and 10, with the increasing value being lower priority (0 has the highest priority and 10 has the lowest priority). Currently, Planner interprets values 0 and 1 as "urgent", 2, 3 and 4 as "important", 5, 6, and 7 as "medium", and 8, 9, and 10 as "low". Additionally, Planner sets the value 1 for "urgent", 3 for "important", 5 for "medium", and 9 for "low".
referenceCount
Int32
Number of external references that exist on the task.
startDateTime
DateTimeOffset
Date and time at which the task starts. The Timestamp type represents date and time information using ISO 8601 format and is always in UTC time. For example, midnight UTC on Jan 1, 2014 is 2014-01-01T00:00:00Z